Commissioning
_________________
_________________
|
|
Third
Party Independent Commissioning / Recommissioning Specialists of New
and Existing Buildings
|
System
Commissioning
-
Systems Review
-
Planning and Co-ordination
-
Deficiency Planning and Co-ordination
-
Preliminary and Final Start-up
-
Control Sequences
-
Warranty Documentation
-
Client / Contractor Awareness
-
Client Training
-
Health, Safety and Security Verification
-
Air and Water Balancing
-
Project Close-Out
System
Recommissioning
-
Duct Systems Inspection
-
Review Costs and Performance
-
Review Occupancy Changes
-
Client Retraining
-
Air and Water Rebalancing
-
Indoor Air Quality
-
Fresh Air Requirements
-
Filtration Methods
-
New Code Revisions
|
|
________________________________________________________________
________________________________________________________________
Recommissioning of Existing Buildings or Systems
________________________________________________________________
________________________________________________________________
|
|
Many
buildings or systems are modified over a period of time and the HVAC
systems
no longer operate as they were originally designed or installed. We
work with your staff
to review the systems and suggest retrofit as required to update them
to meet the
changes in occupancy or codes.
-
Verify that systems are still
operating as they should be or were intended to be
-
Prevent unnecessary maintenance and
operating costs
-
Verify zoning layouts and current
occupancy usage
-
Improve comfort needs due to
occupancy changes
-
Improve Indoor Air Quality (IAQ) to
meet new code requirements and to increase occupancy productivity
-
All Commissioning procedures
implemented are in accordance with SMACNA and ASHRAE standards
-
Standard forms for Start-up and
Commissioning can be provided for review
|
|
____________________________
____________________________
Third Party Specialists
____________________________
____________________________
|
|
Act directly for the Owner and
report to same with the responsibility of all phases of the
commissioning aspects of the Mechanical / Electrical Installation
|
- Review of the original mechanical /
electrical design drawings to verify the original scope of work
- Review the mechanical / electrical
installation at various phases of same
- Provide air and water balancing services for
all equipment
- Provide preliminary start up and functional
verification logs of all equipment prior to commissioning
- Provide final start up and operating logs of
all equipment in conjunction with original equipment manufacturers
- Provide verification of all control
sequences and implementation of same
- Warranty administration documentation
- Identify deficiencies early throughout the
project, instead of at the end when it is often too late to maximize
the quality and performance of the installation
- Provide for satisfied client
/ engineer and contractor with early attention to details and scope
|
|
All
Commissioning procedures implemented are in accordance with SMACNA and
ASHRAE standards.
Standard forms
for Start-up and Commissioning can be provided for review.
|