Parkway Hotel - Sheraton Centre Complex
Toronto, Ontario

Energy Management Control System Design
Including:
NRCan Energy Incentive Innovation (assisted in setting up paperwork for Client application
Design:
Establish contact with the NRCan representative
Site assessment to review existing building condition
Provide complete audit of all building systems
Review options for Mechanical and Electrical services
Prepare design on AutoCAD for Mechanical and Electrical building services
Review final design details
Provide final Engineered Drawings complete with Specifications
Provide budget pricing for the components, installation and software
Prepare tender package
Tender:
Prepare tender package
Assist in pre-tender meeting where required
Answer questions during tender period
Review and analyze tenders complete with written analysis as required
Construction:
Oversee the successful implementation of the energy retrofit program
Answer queries during Construction
Review of Mechanical and Electrical shop drawings
Supervision of installation
Provide Payment Certification
Prepare ongoing Inspection Reports and review deficiencies
Final review of all documentation for Mechanical and Electrical
Final sign-off and Review Letter to NRC
Establishment of the initial Energy Savings Report to NRC
As-Built Drawings
Savings Potential:
Actual Energy Bills = $1,100,000.00 / year (2003)
Estimated Energy Savings = $200,000.00 (20%)
Audit Fee $25,000.00 (NRCan paid 1/2 fee)
Projected Energy Reduction = 17,000 gigajoules
Anticipated NRCan Rebate = $130,000.00
Anticipated Installation Cost = $500,000.00
Final Payback = less than 2 years
CDA Inc.
Pickering, Ontario

Reduction of Energy Use through better management of Process Ventilation System - Heat Recovery and Makeup Air Reduction
Phase I:
Performing a complete audit of all HVAC, process exhaust and building makeup air systems
Review of Mechanical, Electrical and Process drawings and building system
Provide spread sheet profiles of all energy consumption
Provide a complete air balance audit of all systems
Review operations and procedures with Owner's staff
Establish energy savings opportunities
Provide calculations to confirm:
● Energy Use
● Savings Potential
● Cost to implement
● Calculate Return on Investment
Implement the initial retrofit opportunities
Final Results:
|
100,000.00 15,000.00 1 month |
Reduction in Energy Capital Cost Return on Investment |
Phase II:
Provide Audit for Energy Management System installation
Provide Engineering Design for Energy Management System
The Owner decided that the complexity of the HVAC Systems required an upgraded Energy Management system
We designed a Honeywell system to control all Process ventilation systems and office HVAC systems to automate control
Lakeridge Health Corporation - Oshawa
Oshawa, Ontario

Reduction of Water Usage
Included
· Revise internal cooling water piping systems to reduce the consumption of City Water during the winter cooling periods
· Engineering analysis provided the Client with savings projection of approximately $150,000 per year
· In spite of the high cost of working within rigid Hospital construction standards, the payback was approximately 4 years
Labdara Lithuanian Nursing Home
Toronto, Ontario

Reduction of City Water
Included
· Review of the internal usage of domestic water for the facility which resulted in a discovery of improper reporting by the City of Toronto Revenue Department for water consumption
· The compound water meter had been connected backwards and after repeated attempts by the Owner, the City of Toronto insisted that the readings were correct
· Our analysis and final report resulted in a recovery of billings of over $77,000.00
For additional energy conservation projects, please contact our office.