Lakeview Waste Water Treatment Plant
Mississauga, Ontario (Region of Peel)
Preliminary Design and Report
Attend project team meeting to review project requirements
Obtain and review all existing drawings
Site audit to review the existing building conditions and services
Prepare a Preliminary Design Report and review with design team
Detailed Design (50%, 90% and 100%)
Carry out load calculations to confirm requirements for each area
Provide Engineered Drawings for 50%, 90% and 100% submission
Provide complete specifications in NMS format
Submit drawings and specifications for Valued Engineering (F#)
Review VE comments and implement into design
Provide final Engineered Drawings and specifications
for 100% submission and tender
Heating Energy Analysis (Extra to the job done in parallel with base design)
Complete assessment of al mechanical equipment at the entire Facility
perform detailed calculations of heating loads
Prepared detailed report to show potential energy costs savings based on capital investment of new DDC System
Tender Stage
Provide mechanical information as required for the tender package
Assist in pre-tender meeting
Review and analyze Mechanical tenders
Construction Stage (Scheduled for completion 2008)
Provide final Construction drawings incorporating all permit requirements, addenda and any other items brought up during the tender stage
Answer queries during Construction
Review shop drawings
Review of Energy Management Control system interface with the SCADA monitoring
Site Inspections and supervision of installation as required to complete the project
Prepare ongoing Inspection Reports and review deficiencies
Assist and participate in commissioning with the Contractor as required to confirm acceptable operation of the system
Review of progress draws by the Contractor and issuance of payment certificates
Collect and review all documentation as required in the specifications (reports, manuals, etc.)
Prepare as-built drawings
Final inspection with sign-off and review letter to local authorities
Assist and participate in Training of the System with the Contractor and Client
Issuance of final certificates
Lorne Park Water Treatment Plant
Mississauga, Ontario (Region of Peel)
Preliminary Design and Report
Attend initial project meeting with the Region of Peel and the design team to review project requirements
Obtain and review all existing drawings and reports as provided by Peel. Scan and convert drawings into AutoCAD
Site audit to review the existing building conditions and services
Carry out load calculations to confirm requirements for each area
Meet with local authorities to confirm local code requirements
Prepare a Preliminary Design Report
Meet with the Client to review the report and preliminary drawings
Detailed Design (90% and 100%)
After acceptance of the preliminary design by the Client, proceed with detailed design
Provide Engineered Drawings for 90% submission
Provide complete Specifications in NMS format
Submit drawings and specifications for 90% completion to the Client for review
Review 90% completion with the Client
Provide final Engineered Drawings for 100% submission
Submit final drawings for permit as required
Tender Stage
Assist in preparing tender package
Assist in pre-tender meeting
Review and analyze Mechanical tenders
Construction Stage (Scheduled for completion 2007)
Provide final Construction drawings incorporating all permit requirements, addenda and any other items brought up during the tender stage
Answer queries during Construction
Review shop drawings
Review of Energy Management Control system interface with the SCADA monitoring
Site Inspections and supervision of installation as required to complete the project
Prepare ongoing Inspection Reports and review deficiencies
Assist and participate in commissioning with the Contractor as required to confirm acceptable operation of the system
Review of progress draws by the Contractor and issuance of payment certificates
Collect and review all documentation as required in the specifications (reports, manuals, etc.)
Prepare as-built drawings
Final inspection with sign-off and review letter to local authorities
Assist and participate in Training of the System with the Contractor and Client
Issuance of final certificates and lien review information
Whitby Industrial Condos
Whitby, Ontario
Construction completed April 2006
50,000 sq. ft. Industrial Condominium consisting of 10 units @ 5,000 sq. ft.
Shell design plus leaseholds for some Owners
Building is concrete tilt wall - 22 ft. clear height
Mechanical included:
· Sanitary services to each condo unit
· Domestic water to each condo unit
· Sprinkler system for entire building
· Gas services to each condo unit
· Storm water based on meter flow system
· Site services for sanitary, storm, water and gas
Electrical included:
· Main 600Amp/600V/3Ø primary service
· Main transformer and secondary service to building
· Electrical distribution system
· Electrical feeds to each condo unit
· Building lighting
General Motors – Plant Air Conditioning
Oshawa, Ontario
Construction completed Spring 2003
“Approximately 13 million square feet” to provide Air Conditioning for parts of their Central Air Handling System
“Approximately 3000 Tons Air Conditioning – Phase I"
![]() |
Included:
· Upgrading existing Mechanical Penthouses
· Adding Cooling coils and Bypass dampers
· Providing 3-way valves and piping at coils
· Providing distribution piping across the roof
· Providing power wiring from the bus duct system
· Providing PLC and pneumatic control system upgrades and interface
· Commissioning Chillers with coil systems
· The upgraded systems were designed to meet the Department of Labour requirements for Humidex levels for Factory Product in Facilities
· We tracked the Humidex levels and provided cooking to perform dehumidification and mixed with bypass to maintain temperature level at 78ºF and 50% Relative Humidity
· We saved Chiller capacity and energy cost by reducing the original estimated requirement of 6,000 Tons based on standard cooling design criteria
Ontario Power Generation - Wesleyville Storage Facility
Wesleyville, Ontario
Single line diagram of power distribution of entire facility from 44 KV to 120/208V
Prepared single line diagrams including:
4160V and 600V to all buildings
208V power distribution to all sub panels within the outside buildings
600V power distribution within powerhouse
Converted existing site plan to CAD format complete with all required layering updated to As Built conditions
Located approximate location of 44 KV outdoor substations and traced the route and approximate length of 4160V overhead line
Located all outdoor transformers on site plan
Located all indoor equipment within all buildings on the site
Provided all equipment nameplate data on the site plan in the form of hidden attributes which were extracted into Microsoft Excel and formatted for presentation
Create equipment data package from extracted data which makes all data easy to locate for future upgrade or replacement requirements
ABB / ACSYS New Paint Line
Oshawa, Ontario
Construction completed Fall 2002
Raising roof in existing area for new paint line
Our Scope included:
Mechanical and Electrical design
Heating and ventilation design upgrades
Electrical distribution design upgrades
Gas, water, sanitary, and storm services design upgrades
Fire protection design upgrades
As-built drawings
College Woodwork
Kingsway College, Oshawa, Ontario
Construction completed 2002
Paint Kitchen and Paint Storage
Wood Finishing Area and Spray Booths
Warehouse Addition
Review of Campus Electrical Distribution
Mechanical and Electrical Design
Special Explosion Proof Requirements
Review of total Electrical Building Usage
High Pressure Gas Service
Compressed Air and Ventilation Heat Recovery
Conducted Section 7 Health and Safety Review on the entire paint process
General Motors 2 Bay Facility
Oshawa, Ontario
Construction completed 2002
2 Bay Truck Dock Addition
Mechanical and Electrical design
Gas door heaters
Electrical requirements for truck dock stations
Outdoor slab heating in truck docks
Indoor and outdoor lighting
Estee Lauder
Markham, Ontario
| 75 HP High | High Efficiency | |
| Pressure Steam | Low Nox 125 psi | |
| Process Boiler | Steam Boiler |
Construction completed 2002
Existing Facility - Steam Process Plant
Steam Usage Study
Design of High Pressure Steam Process Boiler
Coordinate TSSA Documentation
125 # Fulton High Efficiency Low Nox Steam Boiler
Fire Rated Room Enclosure
Mackie Automotive
Oshawa, Ontario
Construction completed 2000
Complete new facility - production plant and front office area
Compressed air piping design and layout for production lines
Special ventilation requirements for battery charging and storage area
Review of waste water treatment process from rack cleaning and recommendations for revisions of same