____________

____________

 

Industrial
____________

____________

 

Lakeview Waste Water Treatment Plant

Mississauga, Ontario (Region of Peel)

 

Preliminary Design and Report

Detailed Design (50%, 90% and 100%)

Heating Energy Analysis (Extra to the job done in parallel with base design)

Tender Stage

Construction Stage (Scheduled for completion 2008)


 

Lorne Park Water Treatment Plant

Mississauga, Ontario (Region of Peel)

 

Preliminary Design and Report

Detailed Design (90% and 100%)

Tender Stage

Construction Stage (Scheduled for completion 2007)


 Whitby Industrial Condos

Whitby, Ontario

 

 

Construction completed April 2006

 

50,000 sq. ft. Industrial Condominium consisting of 10 units @ 5,000 sq. ft.

Shell design plus leaseholds for some Owners

Building is concrete tilt wall - 22 ft. clear height

 

Mechanical included:

·          Sanitary services to each condo unit

·          Domestic water to each condo unit

·          Sprinkler system for entire building

·          Gas services to each condo unit

·          Storm water based on meter flow system

·          Site services for sanitary, storm, water and gas

 

Electrical included:

·          Main 600Amp/600V/3Ø primary service

·          Main transformer and secondary service to building

·          Electrical distribution system

·          Electrical feeds to each condo unit

·          Building lighting

 


 

General Motors – Plant Air Conditioning

Oshawa, Ontario

 

Construction completed Spring 2003

 

“Approximately 13 million square feet” to provide Air Conditioning for parts of their Central Air Handling System

“Approximately 3000 Tons Air Conditioning – Phase I"

 

 

 

Included:

·         Upgrading existing Mechanical Penthouses

·         Adding Cooling coils and Bypass dampers

·         Providing 3-way valves and piping at coils

·         Providing distribution piping across the roof

·         Providing power wiring from the bus duct system

·         Providing PLC and pneumatic control system upgrades and interface

·         Commissioning Chillers with coil systems

 

·       The upgraded systems were designed to meet the Department of Labour requirements for Humidex levels for Factory Product in Facilities

·       We tracked the Humidex levels and provided cooking to perform dehumidification and mixed with bypass to maintain temperature level at 78ºF and 50% Relative Humidity

·       We saved Chiller capacity and energy cost by reducing the original estimated requirement of 6,000 Tons based on standard cooling design criteria

 


 

Ontario Power Generation - Wesleyville Storage Facility

Wesleyville, Ontario

 

   

 

Single line diagram of power distribution of entire facility from 44 KV to 120/208V

 

Prepared single line diagrams including:


 

ABB / ACSYS New Paint Line

Oshawa, Ontario

 

Construction completed Fall 2002

 

Raising roof in existing area for new paint line

 

Our Scope included:


 

College Woodwork

Kingsway College, Oshawa, Ontario

 

   

Construction completed 2002

 

Paint Kitchen and Paint Storage

Wood Finishing Area and Spray Booths

Warehouse Addition

Review of Campus Electrical Distribution

Conducted Section 7 Health and Safety Review on the entire paint process

 


 

General Motors 2 Bay Facility

Oshawa, Ontario

 

    `

Construction completed 2002

 

2 Bay Truck Dock Addition


 

Estee Lauder

Markham, Ontario

 

   

75 HP High   High Efficiency
 Pressure Steam   Low Nox 125 psi
Process Boiler   Steam Boiler

 

Construction completed 2002

 

Existing Facility - Steam Process Plant


 

Mackie Automotive

Oshawa, Ontario

 

Construction completed 2000

 

Complete new facility - production plant and front office area


TOP