Equipment Auditing
-
Air
and Water Balance
-
Control Sequences
-
Warranty Documentation
-
Maintenance Deficiencies
-
Code
Infractions
-
Indoor Air Quality Analysis
-
Audit
of Zoning and Occupancy Usage
-
Computerization of Maintenance
-
Scheduling of Routines
-
Budgeting / Auditing of Energy Consumption
-
Long
Term Performance
-
Back
Flow Prevention
-
Review all building drawings, operating and instruction manuals and all
commissioning logs wherever possible to determine the scope of
equipment, it's intended operating procedure and who commissioned same.
-
Perform a complete detailed audit of all mechanical / electrical
equipment noting all pertinent information required to set up a
maintenance program
-
Check
all water and air balancing reports and, where deemed necessary, perform
a new balance check to verify that data. At the very least, we
spot check to verify balancing has not changed.
-
Note
all operating sequences and verify that the equipment is still operating
within that same sequence - Note any changes of differences from the
original data on hand.
-
Have
a qualified service representative (preferably independent third party)
do a complete deficiency list of all the equipment in the audit above.
-
Make
a note of zoning deficiencies, code infractions, problems with air
quality and occupancy concerns - to help review the present operation
and revisions required to bring equipment up to latest code and comfort
requirements (You now have a legal responsibility to do so).
-
Produce a computerized equipment schedule using the latest software
programs to set up the following routines:
-
Maintenance scope
-
Maintenance routines
-
Work dispatch / verification
-
History maintenance log
-
Operating hours
-
Expected life of equipment
-
Long term budgeting
- Audit the present energy consumption
to allow past and future comparison of equipment operating
efficiencies
- Set up and review the long term
performance of preventative maintenance program